![]() |
| This hatch outside the building was open on Friday November 28, 2014 |
![]() |
| Area of pipe break inside building front door on first floor. |
As part of the build back, FM will have the pipes in the entryway insulated.
Areas were noted for additional abatement today Dec. 1, 2014. Mavo will be following up using containment as it is past the 48 hour wait period.


No comments:
Post a Comment