| Area of water leaks to the right of the fume hood. (photo taken 7/27/2015) |
 |
| Plastic protection placed over the equipment |
 |
| Infrared photo of water on the plastic |
 |
| Area of water damage to the left of the fume hood |
 |
| Water on the counter |
Sometime between July 25, 2015 and July 26, 2015 water entered room 758 Civil Engineering. Facilities Management later discovered that a blocked drainage system above the room was the source of the water. The pH of the collected water from the leak was 7. Potable water in the lab had a pH of 8. FM is working to dry out the space. Damage at this point is minimal as water was kept away from the instruments in the lab.