Civil Engineering room 758 7/26/2015

Area of water leaks to the right of the fume hood. (photo taken 7/27/2015)
Plastic protection placed over the equipment
Infrared photo of water on the plastic


Area of water damage to the left of the fume hood
Water on the counter
Sometime between July 25, 2015 and July 26, 2015 water entered room 758 Civil Engineering. Facilities Management later discovered that a blocked drainage system above the room was the source of the water. The pH of the collected water from the leak was 7.  Potable water in the lab had a pH of 8.   FM is working to dry out the space.  Damage at this point is minimal as water was kept away from the instruments in the lab.  